What You Need To Know About Heavy Equipment RORO Shipping

If you are thinking about shipping heavy equipment internationally, RORO (Roll-On, Roll-Off) shipping may be the best option for you. Compared to other methods of ocean freight shifting, RORO has a number of key benefits including enhanced speed and convenience.
But if you’ve never moved a piece of heavy machinery using RORO shipping before, you may have some questions about the process and what to expect. In this guide from A-1 Auto Transport, we’ll discuss the basics, and help you learn everything that you need to know about heavy equipment.
Heavy Equipment Pricing & Time Examples
- Heavy equipment RoRo shipping costs $1,000–$5,000+ internationally, with high-frequency lanes like U.S.–Asia Pacific offering more competitive rates than low-volume routes.
- International RoRo transit runs 2–6 weeks; U.S.–Canada moves can arrive within 2 weeks, while U.S.–Europe routes typically take 3–5 weeks or longer.
- RoRo carriers reject equipment with leaking hydraulics or inoperable wheels; fuel tanks must stay at ¼ capacity, and port customs clearance adds processing time.
| Shipping To/FroM | Cost | Distance | Estimated Time In Transit |
|---|---|---|---|
| Fairfield to Wichita | $1382 | 790 miles | 3 - 5 days |
| Scottsdale to Cleveland | $3517 | 2004 miles | 6 - 8 days |
| Glendale to Newark | $719 | 405 miles | 3 - 5 days |
| Des Moines to Santa Ana | $2036 | 1158 miles | 4 - 6 days |
| Fayetteville to Jersey City | $2296 | 1312 miles | 4 - 6 days |
| Salt Lake City to Chandler | $2093 | 1196 miles | 4 - 6 days |
| Sioux Falls to North Las Vegas | $2385 | 1363 miles | 4 - 6 days |
| Shreveport to Scottsdale | $2194 | 1254 miles | 4 - 6 days |

New Deals are now available for shipping all types vehicles using our vetted reliable shippers. Compare price estimates & Unlock up to 25% off.
What Is RORO Shipping? Understanding The Basics
It is short for “Roll-On, Roll-Off” shipping. As the name implies, in this type of shifting, your equipment “rolls on” to the cargo ship when it’s initially shipped, and “rolls off” when it arrives at the destination port. Basically, your equipment will be driven directly into the cargo carrier using a ramp, and offloaded in the same manner.
This is in contrast to other methods of hauling like LOLO (Lift-On, Lift-Off) shipping, which uses cranes to load and unload cargo, usually in the form of standardized cargo containers. With this, your vehicle or equipment can be loaded quickly and easily, since it can simply be driven up the ramp and into the cargo hold of the ship, where it will be secured for transport.
Even heavy equipment and machinery that is not self-propelled – such as flat-bed trailers or grain carts – can be loaded using RORO shipping. They will simply be towed into position with a tractor or a truck, and then secured for shipping.
However, it is essential to realize that many companies will not accept heavy equipment that is not operational. For example, a heavy-duty diesel truck or crane that is not currently running due to engine issues or electrical problems may not be moved with RORO shipping.
Policies vary by carrier, so if you want to relocate non-functional and non-operational equipment, consult with your RORO carrier to see if they will accept the shipment.
What Are The Benefits This?
Choosing this for heavy equipment has a number of benefits, including faster overall transportation speed, a streamlined relocating preparation process, and enhanced convenience, since your equipment will not need to be disassembled to fit into one or more cargo containers. Let’s take a deeper look at these benefits now.
- Faster shipping speed – Cars, trucks, and heavy equipment can simply be driven directly into a RORO ship at your home port, and then driven off the ship at the destination port. There is no need to wait days for cargo containers to be unloaded and cataloged – you can usually access your heavy equipment as soon as the container ship makes port and begins the unloading process.
- Simpler shipping preparation process – You do not need to take as many steps to prepare your heavy equipment for shifting, and you can usually leave some fuel in the tank and leave the battery connected if the vehicle will be driven on and off the ship using its own power.
- Enhanced convenience – Your vehicle can remain completely intact during shipping, with no need to remove any components to fit it into a cargo container. It will be fully operational as soon as it’s moved to your destination, allowing you to benefit from enhanced convenience – and get it to your worksite and begin operations right away.
For all of these reasons, it is typically the best option if you need to relocate heavy machinery to another country, and you want to move it in a cost-effective, convenient manner.

How Long Does It Take To Send Equipment?
The transit time for sending heavy equipment can vary quite a bit. If you’re sending a piece of machinery from the USA to Canada, for example, your equipment may arrive within just two weeks or less. In contrast, sending equipment to Europe from the US may take anywhere from 3-5 weeks or longer.
After you contact a company for a quote for the delivery of your heavy equipment, they will give you a detailed overview of the time it will take for your machinery to arrive.
The time it takes to send your equipment depends on the destination you choose, the number of stops the RORO ship is making (if any) before it reaches your destination port, and a number of other factors. You’ll also need to consider the time it takes to clear customs when planning your shipment.
How Do I Prepare My Heavy Equipment For RORO Shifting?
You should clean out the interior of the machinery and remove any personal items or loose items. Any alarm systems, if present, should be disconnected. This is also a good time to check things like tire pressure (if applicable), look for leaks, and check on the overall maintenance status of your vehicle.
The fuel tank must usually be about ¼ full to ensure there is enough fuel to load and unload your vehicle in RORO shipping. Batteries can remain connected until your vehicle is loaded – though the freight company may choose to disconnect them in transit and reconnect them when your vehicle reaches its destination.
How Do I Send Heavy Equipment To Port?
Depending on your carrier, you have a few options. Some ocean freight carriers offer transportation to port as part of their services packages. If your carrier does not, you can hire a specialized heavy equipment transportation company to move your equipment by rail and/or truck, depending on your destination port. Or, if you have your own flatbeds and shifting equipment, you can handle the hauling process on your own.
Contact Us
At A-1 Auto Transport, we make it easy to relocate your heavy equipment anywhere in the world. We work with the most reputable freight companies in America, and can help you secure heavy equipment RORO shipping services for your equipment. Contact us online or give us a call at (888) 230-9116 to learn more and get started.
Frequently Asked Questions
What is heavy equipment RORO shipping?
Heavy equipment RORO shipping is an ocean-freight method that moves machinery onto a vessel over a ramp instead of lifting it aboard with cranes. A working loader, forklift, or farm tractor can drive onto an enclosed vehicle deck, where crews secure it for the voyage, then drive off at the destination. Equipment that cannot move under its own power may travel on an approved roll trailer or wheeled platform, depending on the vessel and terminal. This method accommodates many construction and agricultural machines that are difficult to fit inside standard shipping containers.
How much does heavy equipment RORO shipping cost?
As of October 13, 2026, port-to-port RoRo freight from U.S. ports to Nigeria is roughly $4,500–$7,500 for operable forklifts and $8,500–$14,000 for mid-size excavators. These are ocean-shipping planning ranges, not complete door-to-site prices. Larger dimensions, specialized handling, and different international routes can change the rate substantially. Inland hauling, terminal charges, customs duties, and destination delivery may also be billed separately. For an itemized estimate, provide your machine's make, model, operating weight, exact dimensions, and origin and destination ports through A1's heavy equipment quote form.
What types of heavy equipment qualify for RORO shipping?
Forklifts, wheel loaders, graders, agricultural tractors, telehandlers, and some tracked machines can qualify for RORO shipping when the vessel can safely accommodate their dimensions and operating condition. Standard drive-on loading generally requires working steering, brakes, and propulsion, along with suitable points for securing the machine. Steel-tracked equipment may face carrier restrictions because tracks can damage vessel decks. Some non-running machinery can travel on a specialized roll trailer, subject to advance approval. Send the carrier accurate dimensions, equipment photos, and operating details before booking.
Is RORO safer than container shipping for heavy equipment?
RORO is not automatically safer than container shipping, but it can reduce handling risks when heavy equipment drives directly onto the vessel. Crews secure machinery to designated points on protected cargo decks, avoiding some of the lifting required by other shipping methods. Containers provide an enclosed, isolated space for smaller machines, although loading may require lifting or partial disassembly. Large equipment may not fit inside a standard container at all. The better choice depends on the machine's dimensions, operating condition, and securing requirements. A1's overseas heavy equipment shipping guide explains the available methods.
How long does international RORO shipping take for heavy equipment?
International RORO shipping for heavy equipment commonly takes 2–6 weeks port-to-port on established overseas routes, depending on the vessel's scheduled stops and destination. U.S. Gulf Coast sailings to northern Europe can take approximately 14–21 days, while East Coast services to the Middle East may take 25–35 days. These are ocean-transit estimates; arranging inland transport, waiting for vessel departure, and clearing customs add time to the complete shipment. Confirm the scheduled departure, arrival port, and expected cargo-release window before planning when the equipment will be available.
How do I prepare heavy equipment for RORO shipping?
Prepare heavy equipment for RORO shipping by cleaning the machine thoroughly, fixing fluid leaks, and confirming that it can move, steer, and brake safely. Photograph its condition, record its weight and exact dimensions, and secure booms, buckets, blades, and loose accessories in the agreed transport position. The booked carrier determines the acceptable fuel level, battery arrangements, and lashing requirements, so confirm these before port delivery. Used agricultural equipment may need additional cleaning to meet the destination country's biosecurity rules. A1's heavy equipment preparation guide provides further preparation steps.